In April 1961 the idea of creating a company to make electric motors is conceived. On September 16, Werner Ricardo Voigt, Eggon João da Silva and Geraldo Werninghaus founded WEG. Initial Capital Stock: Cr$ 3,600.00 (three thousand and six hundred cruzeiros).
WEG buys the piece of land and begins building the Manufacturing Plant I. In the same year, it starts making motors in the plant.
1st National Sales Convention and Foundation of WEG Recreational Association (ARWEG).
First Internal Committee on Accident Prevention is created.
Creation of CENTROWEG. Then, the region did not offer technical training, and the founders created CENTROWEG to provide qualifications for the employees. The school takes adolescents to the world of technology, discovering and encouraging great talents.
Creation of WEG quality policy and production of 1st motor according to ABNT and IEC standards. Concern with quality is in WEG's DNA. Since the foundation, the company has been concerned to meet all required standards.
Beginning of exportation to Guatemala, Uruguay, Paraguay, Ecuador and Bolivia.
WEG's shares start to be traded on the Stock Market.
First reforestation park is created.
Purchase of the piece of land for Manufacturing Plant II and beginning of the building of the factory.
Exportation of motors reaches 20 countries.
One million motors produced.
Opening of an office in Germany with a local partnership – Motores Jara
Opening of Manufacturing Plant II.
Implementation of the Technological Center (Manufacturing Plant I)
Creation of WEG Acionamentos
Creation of WEG Transformadores and WEG Energia.
Creation of the QCC.
Launch of the first line of contactors and protection relays.
Launch of the first high power motors – 100 to 200 KW
WEG Química is created
WEG receives the first award: “Exame Magazine - Best and Biggest Ones”.
Creation of WEG Automação
Mr. Eggon João da Silva leaves the presidency and hands it over to Décio da Silva. The founders form the Board of Directors.
Production of the first transformer of 10 thousand kVA, 138 kV, with 35 tons and 5.6m high. The largest produced in Santa Catarina state then.
Inauguración de la Filial en EE.UU.
Se inaugura una de las fundiciones más modernas de América Latina en Guaramirim/SC.
Es distribuida la primera participación de ganancias.
WEG recibe por la primera vez la certificación ISO 9001.
Creación de los Centros de Negocios Industriales
Filial en Alemania.
Realización de la primera Acción Comunitaria WEG.
Filial na Inglaterra.
WEG recebe Prêmio Nacional de Qualidade.
Filiais na França, Espanha e Suécia.
WEG alcança 79% de market share no Brasil em motores elétricos e exporta 29% de sua produção para cerca de 55 países.
Aquisição das primeiras fábricas no exterior (Argentina e México).
Faturamento do primeiro bilhão de reais em um só ano.
WEG recebe a certificação ISO 14001
Aquisição de fábrica em Portugal.
Fornecimento do maior transformador WEG até então (200MVA, 550kV).
Inauguração do Museu WEG.
Fabricação do maior gerador do mundo até então (50.000kVA, 13,8kV, 4 polos).
Inauguração da primeira fábrica na China.
Abertura de filial em Singapura.
Compra da fábrica de Manaus.
Produção do motor número 100.000.000.
Aquisição da Trafo, fabricante de transformadores de força de grande porte e de subestações móveis e fixas com unidades em Gravataí (RS) e Hortolândia (SP).
Adquire a fabricante de turbinas hidraúlicas Hidráulica Industrial S/A - HISA. A aquisição reforça a atuação da WEG no segmento de geração, transmissão e distribuição de energia.
Entra no índice Novo Mercado da Bovespa, uma seção destinada à negociação de ações de empresas que adotam, voluntariamente, práticas de governança corporativa adicionais às que são exigidas pela legislação brasileira.
Décio da Silva takes over the presidency of the WEG Board of Directors and Harry Schmelzer Jr. takes over as WEG's CEO
Opening of a branch in Russia.
Building of the Transformer Manufacturing Plant in Mexico (Huehuetoca)
Beginning of the manufacturing operations of WEG India.
Acquisition of Instrutech, in São Paulo, a Brazilian company manufacturer of safety, commercial and industrial automation products and systems.
Acquisition of share control of Voltran.
Acquisition of Zest Electric, WEG distributor in South Africa.
Acquisition of the coating factory Pulverlux in Argentina.
Acquisition of the distributor FOURNAIS A/S in Denmark.
Acquisition of Watt Drive AntriebstechnikGmbH, Austrian company specialized in the development and manufacture of gearboxes, gearmotors, frequency inverters and drive systems.
Acquisition of the Electric Machinery company in the USA. A company specialized in motors, generators and exciters.
Estabelecimento de Joint-Venture com a CESTARI Industrial e Comercial – empresa de Monte Alto/SP, para o desenvolvimento, a fabricação e comercialização de redutores e motorredutores.
Início da fabricação de aerogeradores
Lançamento do Livro WEG 50 anos.
Inauguração da WEG Índia (WII), em Hosur.
Criação da filial no Peru.
Inauguração da WEG Linhares/ES.
Aquisição da Injetel Indústria e Comércio de Componentes Plásticos Ltda., empresa especializada na fabricação e comercialização de interruptores, tomadas e plugues para aplicações comerciais e prediais.
Aquisição da empresa de tintas industriais e de repintura automotiva Stardur Tintas Especiais Ltda. de Indaiatuba/SP.
First supply in wind power generation. Equipment with capacity of 90 MW was installed on a wind farm located in the Northeast of Brazil.
International sales reached 51% (NOI) of WEG's revenue.
Acquisition of Indústria de Tintas e Vernizes Paumar S.A., a company specialized in manufacturing and trading coatings, varnishes, enamels and lacquers.
Opening of the branch in Ecuador.
Acquisition of the transformer and substation manufacturing business from Hawker Siddeley Electric Africa (Pty) Ltd. located in South Africa. Manufacturer of miniature substations and distribution transformers.
Acquisition of Antriebstechnik KATT Hessen GmbH, a company that manufactures special high speed motors. Headquartered in Homberg with a branch in Dresden, Germany.
Acquisition of the FTC Energy Group, a company that manufactures and assembles electrical panels for process automation based in Bogota, Colombia.
Acquisition of the manufacturing plant of motors and gearmotors from Württembergische Elektromotoren GmbH located in Germany.
Acquisition of the manufacturing plants of electric motors for appliances Changzhou Sinya Electromotor Co. and of the manufacturing plant of component parts Changzhou Machine Master Co. located in China.
Acquisition of a service unit from Efacec Energy Service in the city of Jaboatão dos Guararapes (State of Pernambuco).
Acquisition of the manufacturing plant of high voltage transformers, miniature substations, molded-case circuit breakers and related services from TSS Transformers (Pty) Ltd (“TSS”), manufacturer headquartered in Heidelberg (Gauteng), South Africa.
Acquisition of Transformadores Suntec, headquartered in Medelin, Colombia
WEG is chosen Company of the Year by Exame magazine.
WEG has manufacturing plants in eleven countries and commercial offices in 29 countries. It has over 31,000 employees.
Acquisition of Autrial S.L., manufacturer of electrical panels for industrial installations and equipment headquartered in Valencia, Spain.
WEG acquires Bluffton Motor Works, LCC., an electric motor factory in the USA.
WEG greenfield manufacturing site in Rugao, China.
Acquires the Brazilian turbines manufacturer TGM. Acquires the US transformers business of CG Power.
Enters in the business of solutions for industry 4.0 with the creation of a specific department for digital businesses and the acquisition of 51% of the share capital of PPI-Multitask and V2COM.
Acquires the control of two startups: BirminD, a technology company active in the Artificial Intelligence market applied to Industrial Analytics and MVISIA, which is specialized in artificial intelligence solutions applied to computer vision for the industry.
Anuncio de la construcción de una nueva fábrica en Santo Tirso, Portugal. La empresa tiene la intención de invertir 23,5 millones de euros para construir 22.600 m² en el mismo terreno donde WEG ya tiene una operación de 16.300 m² dedicada a la fabricación de motores industriales de baja tensión. Ampliará la producción de motores eléctricos de gran tamaño y transferirá su fábrica ubicada en Maia a Santo Tirso, centralizando todas las operaciones en el mismo lugar. Se espera que la nueva fábrica en Santo Tirso comience a operar en el primer trimestre de 2024 y genere alrededor de 100 nuevos empleos.
• Lanzamiento del Programa WEG de Carbono Neutral con los siguientes objetivos generales:
1. Reducir el 52%* de las emisiones** para 2030
2. Alcanzar Net-Zero (emisiones netas neutras) para 2050
*Promedio global de las operaciones de WEG. Los objetivos por operación y país siguen la Contribución Nacionalmente Determinada (NDC) del país o el 52%, lo que sea mayor.
**Emisiones Globales de WEG de Alcance 1 (combustibles fósiles) y 2 (energía no renovable), año base 2021. Propósito: Desarrollar tecnologías y soluciones para contribuir a construir un mundo más eficiente y sostenible.
• Inauguración de la fábrica de motores WEG en Argelia.
Alberto Yoshikazu Kuba es el nuevo presidente ejecutivo de WEG, asumiendo el cargo anteriormente ocupado por Harry Schmelzer Jr. durante 16 años.
Foto: Exame/Leandro Fonseca