Retornar para Minha Conta
A WEG, do princípio aos dias de hoje. Conheça a evolução da nossa História, saiba mais da nossa evolução e conquistas.
In April 1961 the idea of creating a company to make electric motors is conceived. On September 16, Werner Ricardo Voigt, Eggon João da Silva and Geraldo Werninghaus founded WEG. Initial Capital Stock: Cr$ 3,600.00 (three thousand and six hundred cruzeiros).
WEG buys the piece of land and begins building the Manufacturing Plant I. In the same year, it starts making motors in the plant.
1st National Sales Convention and Foundation of WEG Recreational Association (ARWEG).
First Internal Committee on Accident Prevention is created.
Creation of CENTROWEG. Then, the region did not offer technical training, and the founders created CENTROWEG to provide qualifications for the employees. The school takes adolescents to the world of technology, discovering and encouraging great talents.
Creation of WEG quality policy and production of 1st motor according to ABNT and IEC standards. Concern with quality is in WEG's DNA. Since the foundation, the company has been concerned to meet all required standards.
Beginning of exportation to Guatemala, Uruguay, Paraguay, Ecuador and Bolivia.
WEG's shares start to be traded on the Stock Market.
First reforestation park is created.
Purchase of the piece of land for Manufacturing Plant II and beginning of the building of the factory.
Exportation of motors reaches 20 countries.
One million motors produced.
Opening of an office in Germany with a local partnership – Motores Jara
Opening of Manufacturing Plant II.
Implementation of the Technological Center (Manufacturing Plant I)
Creation of WEG Acionamentos
Creation of WEG Transformadores and WEG Energia.
Creation of the QCC.
Launch of the first line of contactors and protection relays.
Launch of the first high power motors – 100 to 200 KW
WEG Química is created
WEG receives the first award: “Exame Magazine - Best and Biggest Ones”.
Creation of WEG Automação
Mr. Eggon João da Silva leaves the presidency and hands it over to Décio da Silva. The founders form the Board of Directors.
Production of the first transformer of 10 thousand kVA, 138 kV, with 35 tons and 5.6m high. The largest produced in Santa Catarina state then.
Opening of a Branch in the USA.
Opening of one of the most modern foundries of Latin America in the city of Guaramirim (State of Santa Catarina).
Distribution of the first profit sharing.
WEG receives, for the first time, the ISO 9001 certification.
Creation of the Industrial Business Centers
Branch in Germany.
The first WEG Community Action is carried out.
Branch in England.
WEG receives the National Quality Award.
Branches in France, Spain and Sweden.
WEG reaches 79% of market share of electric motors in Brazil, and it exports 29% of its production to approximately 55 countries.
Acquisition of the first factory abroad (Argentina and Mexico).
Revenue reaches the first billion reais in a single year.
WEG receives ISO 14001 certification.
Acquisition of manufacturing plant in Portugal.
Supply of the largest WEG transformer until then (200MVA, 550kV).
Opening of WEG museum.
Manufacture of the largest generator of the world (50,000kVA, 13.8kV, 4 poles).
Opening of the first manufacturing plant in China.
Opening of a branch in Singapore.
Acquisition of the manufacturing plant in Manaus.
Production of the motor number 100,000,000.
Acquisition of Trafo, manufacturer of large power transformers, and conventional and mobile substations, with units in the city of Gravataí (State of Rio Grande do Sul) and Hortolândia (State of São Paulo).
WEG acquire the hydraulic turbines manufacturer Hidráulica Industrial S/A - HISA. The acquisition reinforces WEG's position on the energy generation, transmission and distribution segment.
It is listed in Bovespa Novo Mercado, a segment of the stock market that trades stocks of companies that voluntarily adopt corporate governance practices in addition to those required by the Brazilian legislation.
Décio da Silva takes over the presidency of the WEG Board of Directors and Harry Schmelzer Jr. takes over as WEG's CEO
Opening of a branch in Russia.
Building of the Transformer Manufacturing Plant in Mexico (Huehuetoca)
Beginning of the manufacturing operations of WEG India.
Acquisition of Instrutech, in São Paulo, a Brazilian company manufacturer of safety, commercial and industrial automation products and systems.
Acquisition of share control of Voltran.
Acquisition of Zest Electric, WEG distributor in South Africa.
Acquisition of the coating factory Pulverlux in Argentina.
Acquisition of the distributor FOURNAIS A/S in Denmark.
Acquisition of Watt Drive AntriebstechnikGmbH, Austrian company specialized in the development and manufacture of gearboxes, gearmotors, frequency inverters and drive systems.
Acquisition of the Electric Machinery company in the USA. A company specialized in motors, generators and exciters.
Establishment of the Joint-Venture with CESTARI Industrial e Comercial – a company located in the city of Monte Alto (State of São Paulo) – to develop, manufacture and trade gearboxes and gearmotors.
Beginning of the manufacturing of wind turbines
Publishing of the book WEG 50 years.
Opening of WEG India (WII) in Hosur.
Establishment of the branch in Peru.
Opening of WEG Linhares (State of Espírito Santo).
Aquisição da Injetel Indústria e Comércio de Componentes Plásticos Ltda., empresa especializada na fabricação e comercialização de interruptores, tomadas e plugues para aplicações comerciais e prediais.
Aquisição da empresa de tintas industriais e de repintura automotiva Stardur Tintas Especiais Ltda. de Indaiatuba/SP.
Primeiro fornecimento em geração de energia eólica. Equipamentos com capacidade de 90 MW foram instalados em parque eólico localizado no Nordeste do Brasil.
Vendas no mercado externo alcançaram 51% (ROL) do faturamento da WEG.
Aquisição da Indústria de Tintas e Vernizes Paumar S.A., empresa especializada na fabricação e comercialização de tintas, vernizes, esmaltes e lacas.
Criação da filial WEG no Equador.
Aquisição de fábrica de transformadores e subestações pertencentes à Hawker Siddeley Electric Africa, na África do Sul. Fabricante de mini-subestações e transformadores de distribuição.
Aquisição da Antriebstechnik KATT Hessen GmbH, empresa que atua na fabricação de motores especiais de alta velocidade. Com sede em Homberg e filial em Dresden na Alemanha.
Aquisição da FTC Energy Group, empresa que atua na fabricação e montagem de painéis elétricos para automação de processos com sede em Bogotá, na Colômbia.
Aquisição de fábrica de motores e motoredutores pertencentes à Württembergische Elektromotoren GmbH, na Alemanha.
Aquisição das fábricas de motores elétricos para linha branca Changzhou Sinya Electromotor Co. e do fabricante de componentes Changzhou Machine Master Co., na China.
Aquisição de unidade de serviço da Efacec Energy Service em Jaboatão dos Guararapes, PE.
Aquisição de negócio de fabricação de transformadores de alta tensão, minissubestações, disjuntores moldados e serviços correlatos, pertencentes à TSS Transformers (Pty) Ltd (“TSS”), fabricante com sede em Heidelberg (Gauteng), África do Sul.
Adquire a Transformadores Suntec, com sede em Medelín na Colômbia.
WEG eleita a Empresa do Ano pela Revista Exame.
WEG tem parques fabris em 11 países e filiais comerciais em 28 países. Já são mais de 31 mil colaboradores.
Adquire a Autrial S.L., fabricante de painéis elétricos para equipamentos e instalações industriais tem sede em Valencia, Espanha.
A WEG adquire a Bluffton Motor Works, LCC., uma fábrica de motores elétricos nos EUA.
Construção da nova fábrica em Rugao, China.
Adquire o fabricante brasileiro de turbinas TGM. Adquire o negócio de transformadores dos EUA da CG Power.
Entra no negócio de soluções para a indústria 4.0 com a criação de um departamento específico para negócios digitais e a aquisição de 51% do capital social da PPI-Multitask e V2COM.
Adquiere el control de dos startups: BirminD, una compañía de tecnología activa en el mercado de Inteligencia Artificial aplicada a Industrial Analytics y MVISIA, que se especializa en soluciones de inteligencia artificial aplicadas a la visión por computadora para la industria.
Anuncio de la construcción de una nueva fábrica en Santo Tirso, Portugal. La empresa tiene la intención de invertir 23,5 millones de euros para construir 22.600 m² en el mismo terreno donde WEG ya tiene una operación de 16.300 m² dedicada a la fabricación de motores industriales de baja tensión. Ampliará la producción de motores eléctricos de gran tamaño y transferirá su fábrica ubicada en Maia a Santo Tirso, centralizando todas las operaciones en el mismo lugar. Se espera que la nueva fábrica en Santo Tirso comience a operar en el primer trimestre de 2024 y genere alrededor de 100 nuevos empleos.
• Lanzamiento del Programa WEG de Carbono Neutral con los siguientes objetivos generales:
1. Reducir el 52%* de las emisiones** para 2030
2. Alcanzar Net-Zero (emisiones netas neutras) para 2050
*Promedio global de las operaciones de WEG. Los objetivos por operación y país siguen la Contribución Nacionalmente Determinada (NDC) del país o el 52%, lo que sea mayor.
**Emisiones Globales de WEG de Alcance 1 (combustibles fósiles) y 2 (energía no renovable), año base 2021. Propósito: Desarrollar tecnologías y soluciones para contribuir a construir un mundo más eficiente y sostenible.
• Inauguración de la fábrica de motores WEG en Argelia.
Alberto Yoshikazu Kuba es el nuevo presidente ejecutivo de WEG, asumiendo el cargo anteriormente ocupado por Harry Schmelzer Jr. durante 16 años.
Foto: Exame/Leandro Fonseca